So this past week - Gabe, Aaron, and Drew took out the wall for real, put up huge beams to hold up the second floor, moved the electrical wiring around, and put sheetrock over the beam, among other things... and then this weekend Gabe and I painted. As in, painted the entire upstairs - 3 bedrooms, 2 bathrooms, and a hallway - a coat of primer, and 2 coats of paint. And baseboards too. Pictures of that to follow, but for now: the great disappearing wall...
cut-down studs that were the original wall
Gabe and Aaron putting in the first beam!
second beam:
beam in place, with temporary walls still there:
one wall being removed:
AND GONE:
Gabe posing on our future bar!
electrical work:
sheetrock-ing:
Soon to come: pictures of the finished paint job upstairs (and carpet, once the guy installs it this week)!
No comments:
Post a Comment